From: Stewart Smith Date: Mon, 23 May 2016 01:27:01 +0000 (+1000) Subject: powerpc/lib: Clarify that adde is an instruction and we mean plural X-Git-Url: https://git.stricted.de/?a=commitdiff_plain;h=ec5619fdba66f091b5b987f980eac690593039d1;p=GitHub%2Fmoto-9609%2Fandroid_kernel_motorola_exynos9610.git powerpc/lib: Clarify that adde is an instruction and we mean plural Signed-off-by: Stewart Smith Signed-off-by: Michael Ellerman --- diff --git a/arch/powerpc/lib/checksum_64.S b/arch/powerpc/lib/checksum_64.S index 8e6e51016cc5..fdec6e613e95 100644 --- a/arch/powerpc/lib/checksum_64.S +++ b/arch/powerpc/lib/checksum_64.S @@ -74,9 +74,9 @@ _GLOBAL(__csum_partial) ld r11,24(r3) /* - * On POWER6 and POWER7 back to back addes take 2 cycles because of - * the XER dependency. This means the fastest this loop can go is - * 16 cycles per iteration. The scheduling of the loop below has + * On POWER6 and POWER7 back to back adde instructions take 2 cycles + * because of the XER dependency. This means the fastest this loop can + * go is 16 cycles per iteration. The scheduling of the loop below has * been shown to hit this on both POWER6 and POWER7. */ .align 5 @@ -275,9 +275,9 @@ source; ld r10,16(r3) source; ld r11,24(r3) /* - * On POWER6 and POWER7 back to back addes take 2 cycles because of - * the XER dependency. This means the fastest this loop can go is - * 16 cycles per iteration. The scheduling of the loop below has + * On POWER6 and POWER7 back to back adde instructions take 2 cycles + * because of the XER dependency. This means the fastest this loop can + * go is 16 cycles per iteration. The scheduling of the loop below has * been shown to hit this on both POWER6 and POWER7. */ .align 5