sched/fair: add function to convert boost value into "margin"
authorPatrick Bellasi <patrick.bellasi@arm.com>
Mon, 22 Jun 2015 17:32:36 +0000 (18:32 +0100)
committerLeo Yan <leo.yan@linaro.org>
Tue, 10 May 2016 08:53:24 +0000 (16:53 +0800)
commit6ed27145013d97e49d7e71a56601033cccee743c
treeca4e498282bdc1256882e7432599f48c8b0a10c2
parent344f4ec4293b75d83282eb13ede965995e5f312f
sched/fair: add function to convert boost value into "margin"

The basic idea of the boost knob is to "artificially inflate" a signal
to make a task or logical CPU appears more demanding than it actually
is. Independently from the specific signal, a consistent and possibly
simple semantic for the concept of "signal boosting" must define:
1. how we translate the boost percentage into a "margin" value to be added
   to the original signal to inflate
2. what is the meaning of a boost value from a user-space perspective

This patch provides the implementation of a possible boost semantic,
named "Signal Proportional Compensation" (SPC), where the boost
percentage (BP) is used to compute a margin (M) which is proportional to
the complement of the original signal (OS):
  M = BP * (SCHED_LOAD_SCALE - OS)
The computed margin then added to the OS to obtain the Boosted Signal (BS)
  BS = OS + M

The proposed boost semantic has these main features:
- each signal gets a boost which is proportional to its delta with respect
  to the maximum available capacity in the system (i.e. SCHED_LOAD_SCALE)
- a 100% boosting has a clear understanding from a user-space perspective,
  since it means simply to run (possibly) "all" tasks at the max OPP
- each boosting value means to improve the task performance by a quantity
  which is proportional to the maximum achievable performance on that
  system
Thus this semantics is somehow forcing a behaviour which is:

  50% boosting means to run at half-way between the current and the
    maximum performance which a task could achieve on that system

This patch provides the code to implement a fast integer division to
convert a boost percentage (BP) value into a margin (M).

NOTE: this code is suitable for all signals operating in range
      [0..SCHED_LOAD_SCALE]

cc: Ingo Molnar <mingo@redhat.com>
cc: Peter Zijlstra <peterz@infradead.org>
Signed-off-by: Patrick Bellasi <patrick.bellasi@arm.com>
kernel/sched/fair.c