x86/unwind: Include __schedule() in stack traces
In the following commit:
0100301bfdf5 ("sched/x86: Rewrite the switch_to() code")
... the layout of the 'inactive_task_frame' struct was designed to have
a frame pointer header embedded in it, so that the unwinder could use
the 'bp' and 'ret_addr' fields to report __schedule() on the stack (or
ret_from_fork() for newly forked tasks which haven't actually run yet).
Finish the job by changing get_frame_pointer() to return a pointer to
inactive_task_frame's 'bp' field rather than 'bp' itself. This allows
the unwinder to start one frame higher on the stack, so that it properly
reports __schedule().
Reported-by: Miroslav Benes <mbenes@suse.cz>
Signed-off-by: Josh Poimboeuf <jpoimboe@redhat.com>
Cc: Andy Lutomirski <luto@amacapital.net>
Cc: Andy Lutomirski <luto@kernel.org>
Cc: Borislav Petkov <bp@alien8.de>
Cc: Brian Gerst <brgerst@gmail.com>
Cc: Dave Jones <davej@codemonkey.org.uk>
Cc: Denys Vlasenko <dvlasenk@redhat.com>
Cc: Dmitry Vyukov <dvyukov@google.com>
Cc: H. Peter Anvin <hpa@zytor.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Link: http://lkml.kernel.org/r/598e9f7505ed0aba86e8b9590aa528c6c7ae8dcd.1483978430.git.jpoimboe@redhat.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>